November 23, 2026 USD 44.93EUR 49.28PLN 11.06
Новини Стрий — коротко й по суті
LIVE

Construction of a large multi-level parking lot begins for a new ski resort in the Carpathians

💼 Economy 2 min read 👁 2

Construction works have started in Volosianka on a multi-level parking facility, which will serve as a key transport infrastructure element for the upcoming all-season resort.

Construction of a large multi-level parking lot begins for a new ski resort in the Carpathians💼Economy

Photo: Telegram: stryi_info

Key points

  • Construction of the first parking phase for 369 cars has begun in Volosianka.
  • The project is part of a new all-season mountain resort infrastructure.
  • The first phase is scheduled for completion by the end of 2027.
  • The final master plan includes over 1,000 parking spaces across three phases.

In the village of Volosianka, located in the mountainous region near the Stryi area, a large-scale construction project has officially commenced. Work has begun on a major multi-level parking facility on the grounds of the future all-season ski resort. This infrastructure project is designed to manage incoming traffic and streamline logistics for the future recreation area.

Project Details and Timeline

According to the developer's plan, the first phase of the parking complex will accommodate 369 vehicles. The completion of this initial construction stage and the commissioning of the facility are scheduled for the end of 2027. The five-level structure will be situated right at the entrance to the resort area.

Overall, the master plan envisions three construction phases that will provide a total capacity of over 1,000 parking spaces. Under the concept, visitors will leave their cars at the perimeter and continue on foot. A dedicated underground pedestrian passage will connect the parking area directly to the Welcome Centre, the lower gondola lift station, and local hotels.

Modern Infrastructure and Safety Standards

The design of the new transport hub incorporates contemporary accessibility and environmental standards. The facility will feature elevators, designated parking spaces for individuals with disabilities, and electric vehicle charging stations. Additionally, a protective shelter will be integrated into the lowest level of the building to ensure safety.

Beyond its primary utility, the architects have included a recreational element in the design. A viewing platform is planned for the roof of the multi-level parking structure. This platform will offer panoramic views of the Slavka river valley and the surrounding Carpathian mountains, turning the parking facility into an additional attraction for visitors.

Source Telegram: stryi_info — t.me/stryi_info/31234 ↗

Contact the newsroom

Got a tip, a proposal or a partnership question? Write to us and we will reply shortly.